Our Work

Sunesis offers a turn-key approach to contracting, providing all the services you need from one vendor. This allows for a single source contracting option for your construction and environmental remediation needs. The company’s ability to perform multiple scopes of work simultaneously effectively streamlines administrative and field operation activities. Thus, reducing coordination requirements and ultimately the client’s costs. Today, Sunesis stands as the premier single-source contractor for any heavy civil projects that are bound by narrow budgets and condensed time schedules.

Our Simultaneous Capabilities Include:

View some of our largest Turn-Key Projects below:

Ohio State University Athletics District

Ohio State University

Sunesis Construction performed new roadway construction as well as the required underground infrastructure including storm, water & sewer piping surrounding the OSU athletic fields.

Sunesis Environmental simultaneously performed asbestos abatement & demolition services to 5 apartment buildings strategically allowing the adjacent buildings to remain occupied.

Lexington Convention Center

Messer Construction

Sunesis Environmental performed selective demolition, full scale structural demolition & asbestos abatement of the existing Lexington convention center and iconic Rupp Arena in preparation for the building of the new Central Bank Center.

Sunesis Construction installed an earthen retention system to allow for the new construction of the Central Bank Center and performed all associated site work & underground utilities needed.

UK Student Center & Alumni Gymnasium

University of Kentucky

Sunesis Environmental performed asbestos abatement & structural demolition to the existing student union center as well as selective demolition to the historic alumni gymnasium. All in preparation for new construction.

Sunesis Construction supported the project by building a temporary support system on the historic alumni gymnasium to allow for reconstruction. In addition, all site work and underground utilities for the new buildings were performed.

Amazon Wilmington

Amazon

Sunesis Environmental performed full scale demolition of the existing warehouses as well as selective demolition on the warehouses to remain. Work also included the demolition of the existing exterior concrete pavement.

Sunesis Construction followed by performing all underground utility install, site work grading, new concrete pavement for loading docks and truck staging areas as well as asphalt paving to the employee parking lot.

Amazon Columbus

Amazon

Sunesis Environmental performed selective demolition to the existing warehouse and completed structural demolition of the interior mezzanine.

Sunesis Construction simultaneously performed all existing pavement removal, site work grading, underground detention system, and installed a fire main for the new facility. Work also included installing an aggregate base for the new parking lot.

Miami University Scott and Minnich Hall

Miami University

Sunesis Environmental performed full asbestos abatement and selective demolition to 2 university classroom buildings, Scott and Minnich Halls for a full renovation of the buildings.

Sunesis Construction simultaneously installed new underground utilities including storm drainage as well as a new fire main. Work also included all surrounding site work in preparation for a new exterior building entrance to Scott and Minnich Halls.

U.K. Grehan Journalism Building

University of Kentucky

Sunesis Environmental performed asbestos abatement, structural demolition and full site excavation of the university journalism building.

Sunesis Construction followed with the installation of a temporary support system to the newly demolished building allowing for reconstruction.

AIMS Ohio Health Hobbs Center

Miami University

Sunesis Environmental performed selective demolition for the emergency repair of a health building damaged by a vehicle collision.

Sunesis Construction followed up with the installation of a temporary support system to the demolished building to allow for reconstruction.

Ohio University President Street

Ohio University

Sunesis Environmental performed asbestos abatement of pipe insulation, floor tiles & drywall, transite siding and caulking at windows for the entire building. Work also included complete structural demolition of the full building including foundations and footers. Backfill, compaction and seed and straw for new green space.

Sunesis Construction performed water main and fire hydrant installation for the project.
Ohio State University (OSU) Athletics District Construction - Turn Key Construction

Ohio State University Athletics District

Ohio State University

Sunesis Construction performed new roadway construction as well as the required underground infrastructure including storm, water & sewer piping surrounding the OSU athletic fields.

Sunesis Environmental simultaneously performed asbestos abatement & demolition services to 5 apartment buildings strategically allowing the adjacent buildings to remain occupied.
Lexington Convention Center Construction - Turn Key Construction

Lexington Convention Center

Messer Construction

Sunesis Environmental performed selective demolition, full scale structural demolition & asbestos abatement of the existing Lexington convention center and iconic Rupp Arena in preparation for the building of the new Central Bank Center.

Sunesis Construction installed an earthen retention system to allow for the new construction of the Central Bank Center and performed all associated site work & underground utilities needed.
University of Kentucky (UK) Student Center Construction - Turn Key Construction

UK Student Center & Alumni Gymnasium

University of Kentucky

Sunesis Environmental performed asbestos abatement & structural demolition to the existing student union center as well as selective demolition to the historic alumni gymnasium. All in preparation for new construction.

Sunesis Construction supported the project by building a temporary support system on the historic alumni gymnasium to allow for reconstruction. In addition, all site work and underground utilities for the new buildings were performed.
Amazon Wilmington Construction - Turn Key Construction

Amazon Wilmington

Amazon

Sunesis Environmental performed full scale demolition of the existing warehouses as well as selective demolition on the warehouses to remain. Work also included the demolition of the existing exterior concrete pavement.

Sunesis Construction followed by performing all underground utility install, site work grading, new concrete pavement for loading docks and truck staging areas as well as asphalt paving to the employee parking lot.
Amazon Columbus Construction - Turn Key Construction

Amazon Columbus

Amazon

Sunesis Environmental performed selective demolition to the existing warehouse and completed structural demolition of the interior mezzanine.

Sunesis Construction simultaneously performed all existing pavement removal, site work grading, underground detention system, and installed a fire main for the new facility. Work also included installing an aggregate base for the new parking lot.

EKU Student Center Construction - Turnkey Construction

U.K. Grehan Journalism Building

University of Kentucky

Sunesis Environmental performed asbestos abatement, structural demolition and full site excavation of the university journalism building.

Sunesis Construction
followed with the installation of a temporary support system to the newly demolished building allowing for reconstruction.

EKU Student Center Construction - Turnkey Construction

AIMS Ohio Health Hobbs Center

Eastern Kentucky University

Sunesis Environmental performed selective demolition for the emergency repair of a health building damaged by a vehicle collision.

Sunesis Construction followed up with the installation of a temporary support system to the demolished building to allow for reconstruction.
Ohio University (OU) President's Street Construction - Turn Key Construction

Ohio University President Street

Ohio University

Sunesis Environmental performed asbestos abatement of pipe insulation, floor tiles & drywall, transite siding and caulking at windows for the entire building. Work also included complete structural demolition of the full building including foundations and footers. Backfill, compaction and seed and straw for new green space.

Sunesis Construction
performed water main and fire hydrant installation for the project.